Case Study: Kitchen Electrics for Two Ovens in Bradfield (CO11)

New kitchens often need different electrics from the old ones. In this home in Bradfield, near Manningtree (CO11), the kitchen was stripped back for a refit and our electrician had two jobs to do before the new units went in: add a power supply for the washing machine and adapt the oven supply so it could run two ovens. Both were then tested.

Why the electrics change when a kitchen changes

A new kitchen layout rarely puts appliances back in exactly the same places. The washing machine moves, a single oven becomes a double, an island appears. Every change means the wiring has to be checked and, often, altered, and it’s far easier to do while the walls are bare, before any units, worktops or tiles go back on.

Kitchen wall stripped back during the refit, with the new washing machine supply in place

A proper supply for the washing machine

Our electrician added a new supply for the washing machine, made up of a switched socket outlet (SSO) and a switched fused connection unit (SFCU).

A switch above the worktop is the easy, safe way to turn an appliance off when it’s tucked away behind a unit. You can isolate it for cleaning, if it leaks, or if it’s playing up, without pulling the machine out first. It also means nobody has to reach behind a heavy, wet appliance to get to a plug.

Adapting the oven supply for two ovens

Sockets and trunking on the bare kitchen wall during the refit, before the new units go in

Swapping one oven for two isn’t just a case of adding another plug. Ovens are among the biggest electrical loads in a home, so before the supply is changed an electrician needs to check:

  • what each oven draws (the rating on the data plate or in the manual)
  • whether the existing cooker circuit can safely carry both, or whether a new circuit is needed
  • how each oven will be isolated, so either can be switched off on its own for servicing

Here the existing oven supply was adapted to allow for the two ovens, then tested.

Testing before the kitchen goes back together

The home's consumer unit, where the kitchen circuits are protected

Every circuit we touch is tested before we leave. That checks the new connections are sound, that protection at the consumer unit will work if there’s a fault, and that everything is safe to use once the kitchen is finished. Testing now, while everything is still accessible, saves taking new units apart later.

Planning a new kitchen? Sort the electrics first

If you’re having a kitchen fitted, tell your electrician early:

  1. Where every appliance is going, including any new ones (second oven, induction hob, wine cooler, boiling water tap).
  2. Where you want sockets above the worktop, and any under-cabinet or plinth lighting.
  3. Whether anything is moving, such as the washing machine, fridge or hob.

That way the wiring is done once, in the right places, before the walls are finished.

You can read more about our kitchen fitting service and our electrical work. If your consumer unit is older, our consumer unit guide explains when an upgrade is worth it.

Electricians in Bradfield, Manningtree and north Essex

We work across north Essex, including Bradfield, Manningtree, Mistley and the Colchester area. See our Colchester area page for more.

Planning a kitchen refit or need a new appliance supply? Call 020 8227 0035 or ask for a quote.



Previous Post
Case Study: Toilet Flush Valve Replaced in Dagenham (RM9)
Next Post
Case Study: Electric Panel Heater Installed in Putney (SW15)
Message us